{"id":2621,"date":"2017-12-26T15:06:45","date_gmt":"2017-12-26T15:06:45","guid":{"rendered":"http:\/\/www.springvilleutah.gov\/power\/?page_id=2621"},"modified":"2017-12-26T15:06:45","modified_gmt":"2017-12-26T15:06:45","slug":"net-metering","status":"publish","type":"page","link":"https:\/\/www.springvilleutah.gov\/power\/customer-owned-generation\/net-metering\/","title":{"rendered":"Net Metering"},"content":{"rendered":"<ol class=\"breadcrumb ms-0\">\n<li class=\"breadcrumb-item\"><a href=\"\/\">Springville<\/a><\/li>\n<li class=\"breadcrumb-item\"><a href=\"\/power\/\">Power<\/a><\/li>\n<li class=\"breadcrumb-item\"><a href=\"\/power\/customer-owned-generation\/\">Customer-Owned Generation<\/a><\/li>\n<li class=\"breadcrumb-item active\">Net Metering<\/li>\n<\/ol>\n<h1 align=\"center\">Net Metering<\/h1>\n<p>The Net Metering Pilot Program was created for customers who installed customer-owned generation systems from June 2008 to December 2017. These customers are grandfathered into the traditional net metering billing schedule until January 1, 2033. Systems installed after January 1, 2018 will\u00a0be enrolled in the <strong><a href=\"\/power\/customer-owned-generation\">Customer-Owned Generation Program<\/a>.<\/strong><\/p>\n<p><a href=\"\/power\/wp-content\/uploads\/sites\/13\/2016\/02\/net-metering-policy-revised-11-13-2012.pdf\" target=\"_blank\" class=\"btn btn-info text-light\" rel=\"noopener\">Net Metering Pilot Program Policy<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Springville Power Customer-Owned Generation Net Metering Net Metering The Net Metering Pilot Program was created for customers who installed customer-owned generation systems from June 2008 to December 2017. These customers are grandfathered into the traditional net metering billing schedule until January 1, 2033. Systems installed after January 1, 2018 will\u00a0be enrolled in the Customer-Owned Generation [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2580,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2621","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/pages\/2621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/comments?post=2621"}],"version-history":[{"count":0,"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/pages\/2621\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/pages\/2580"}],"wp:attachment":[{"href":"https:\/\/www.springvilleutah.gov\/power\/wp-json\/wp\/v2\/media?parent=2621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}